Wednesday, August 26, 2015

A little overnight excitement, and a short river cruise.

At 10:30 last night I took Meg out for a last pee, and spotted a fierce blaze through the trees at the end of the bridge just at the end of the moorings. Fearing that it may be a car on fire, I put Meg back aboard and went to investigate. It turned out to be a pile of rubbish and the flames were already dying down as the accelerant burned off. Then I saw another fire, on the far side of the bridge, bigger and higher than the first.
Back on board myself I rang the local police who took the details, then, 10 minutes later, a fire engine appeared and the crew doused the now-dwindling flames.
I had a look at the debris this morning; it looks like the normal detritus on the far side of the bridge, a wooden bed-frame, the remains of a chair and some unidentifiable timber. But oddly the smaller fire included bundles of papers and packets of frozen food! Very strange…
Anyway, the incident left us a little unsettled. I don’t think we’ll be mooring there again.

On that note, although the grassed area enclosed by the junction and Trundles Lane has been tidied up, there's a slope opposite Harkers Boatyard which suggests a side slipway.IMG_7088

Old maps show a building, Junction House, but I suspect this was a toll house.Knottingley Junction
A bit more research shows that in the mid-1940s, due to demand for more vessels to carry petro-chemicals, Harkers, whose yard was across the canal, did indeed build a side-slip here, the remains of which can still be seen.

It was a wet night that persisted into the morning, but it had dried up by the time we were ready to shove off. Around the corner is Bank Dole Lock, with the river level indicator below. I needn’t have worried…
IMG_7087
The gates and wash-walls could do with a trim!

The lock landing pontoon is a little inconveniently placed on the river side of the lockIMG_7092
It must be tricky if there’s a bit of water about.

The River Aire is broad and deep, but twists and turns considerably on it’s way to West Haddesley and the junction with the Selby Canal.IMG_7101

It was pretty breezy too.
IMG_7095

Beal Lock is about half-way, the very deep chamber indicating the height the river can rise to in flood conditions.IMG_7099

Eggborough Power Station appears ahead, to the right or left, or behind depending on the direction of the particular loop you’re on.
IMG_7102
But it always gets a little nearer.

West Haddesley is actually a flood lock, and at summer levels it’s usually open. The problem is you can’t tell whether it’s open or closed till you're level with the entrance, and by then it’s too late!IMG_7107
So the safest solution is to pull onto the landing and go and have a look first. The lock was in use today, and two boats had just arrived at the canal end.
It was empty, so I brought the first one up and sent him on his way, we then used the lock to drop the foot down, and, after tying up below, I went back and closed up after the second boat to save him having to manoeuvre onto the pontoon.
That done I sorted out the mooring ropes properly, as we are staying here tonight.

Moored below West Haddesley LockIMG_7108

The afternoon turned out sunny, but that wind is still with us. I took Meg for a walk along the flood bank, and the significance of the area’s industry is demonstrated by it’s power production.
At one point three power stations can be seen -

EggboroughIMG_7109

Ferrybridge
IMG_7110

and Drax just visible over the trees.IMG_7111

Between them they can generate 8379 MW of electricity, enough for 8 million homes. Being in the middle of the vast Selby coal-field they were built to run on the black stuff.
Since closure of the Selby Superpit in 2004, most of the fuel is sourced from abroad, although there is still some domestic supply.

Tomorrow we’ll be heading into Selby itself.

Locks 3, miles 6½  

1 comment:

Tom and Jan said...

I remember having to reverse back against the flow to collect Jan from that floating pontoon at Bank Dole Lock. Then I had to do it in reverse on the way back!